Schedule and Cost Control
With the rising cost of real estate, schedule adherence and return on investment have become key concerns for every owner. We leave no room for schedule slippage or budget over-runs, and have zero-tolerance for loss of productivity in our trade groups. We study each project’s progress on a weekly basis to ensure that we meet project goals, reduce time and save money.
- Perform value engineering studies prior to commencement
- Research special equipment and material requirements to expedite execution of work
- Qualify materials and products being specified
- Implement means and methods for site efficiency and safety
- Develop material and labor procurement timelines and strategies
- Establish equipment, material and product availability with respect to schedule impact
- Provide alternative solutions for cost savings
- Establish geographically intelligent logistics, warehousing and delivery solutions